Newly erected glulams and stone wall looking great on a sunny site visit.
Portanure House, Loch Gowna
Aluminium frames have been installed and the windows are going in at Portanure House, Loch Gowna. The old field stone wall is being built, with first-fix plumbing and electrics next to commence.
Malone Park Progress
The concrete slabs have arrived and been installed on top of the basement. Phase one is almost complete.