Aluminium frames have been installed and the windows are going in at Portanure House, Loch Gowna. The old field stone wall is being built, with first-fix plumbing and electrics next to commence.
Clogher House
The steel frame has been erected for Clogher House, and the block-work has begun.
Malone Park Progress
The concrete slabs have arrived and been installed on top of the basement. Phase one is almost complete.